[occ2] roadwork woes

 
From: "Steve Reiter steve.reiter2@PROTECTED [occ2]" <occ2@PROTECTED>
Date: July 23rd 2020
I attempted to send this earlier this week, but I now know it didn't go through. I am resending it with updates. If you get this, please let me know.
 Thanks.

Clark Hollow On Saturday, it was covered with stone from its south end north to Newell Hill Rd, I think. It seems like it has been there for a while, but it's still terrible. There are paths where the stone has been compressed and you can ride more safely, but it certainly takes the fun out of that downhill run.

Then at the north end, from Palmer Rd. to Rt.20, there is heavy stone. Bring your gravel bike. Or your snowmobile.

Apulia Rd. near Rt. 20 in the village was still closed on Saturday, with heavy machinery working in the culvert and no way to pass it on the sides. 

Meadowbrook Rd. in Syracuse from Hurlburt to Westcott street has been resurfaced. They are working on it to fix intersections and have yet to stripe the bike lane, etc.

New Boston St. (from where it joins Canaseraga just north of the railroad tracks where New Boston turns west, to the Canastota village) is recently paved. Last time I rode the whole length, there was no striping. And as of Monday there are still no lines at the south end.
  • This mailing list is a public mailing list - anyone may join or leave, at any time.
  • This mailing list is a group discussion list (unmoderated)
  • Start a new thread, email: occ2@onondagacyclingclub.org

The new OCC List Serv using Dadamail with Amazon SES.

Privacy Policy:

The subscriber information will not sold or used for any other purpose.