[occ2] Wed Ride

 
From: "Bob Ravera RLRavera@PROTECTED [occ2]" <occ2@PROTECTED>
Date: July 28th 2021
Hello all, I am the rider leader for tonight's ride.

Starts at  Green Hills parking lot.

There will be a detour due to bridge construction at the start of Tully Farms Road where it crosses the creek between Route 20 and Webster Road.

To avoid the construction, proceed past Tully Farms Road about 1/2 mile and veer right on to Rowland Road.  Go straight on Rowland and take a right on Route 11A.  Ride south on 11A about 3/4 of a mile and take a right on Webster Road.  Webster is marked with a sign "No Thru Traffic", but I think we are ok with this being on bicycles and the purpose of the sign is to keep the detour traffic off the narrow residential farm road.  It will add about a mile to the 32 and 38 mile rides.

Webester, Nichols and Solvay Roads are clear with no construction or gravel.  Tully Farms is clear with no construction from Webster all the way down. I drove the roads last night.  All three roads joining Tully Farms and 11A, i.e.; Webster, Nichols, and Solvay; are marked with signs saying "No Thru Traffic".  But, again, I think we are just fine on bicycles so riding Solvay Road should be no problem at the south end of the 32 mile ride.

Weather looks good per meteorologist Goetke.  It doesn't get any prettier than Tully Valley so come on out!

Bob Ravera
  • This mailing list is a public mailing list - anyone may join or leave, at any time.
  • This mailing list is a group discussion list (unmoderated)
  • Start a new thread, email: occ2@onondagacyclingclub.org

The new OCC List Serv using Dadamail with Amazon SES.

Privacy Policy:

The subscriber information will not sold or used for any other purpose.